Have you recently bought a new plot and looking for the estimated cost of building a house on it? We have a table with a detailed description of the 900 Square Feet house construction cost. Read it carefully, it will help you to make the estimated cost of the construction of the house.
We have compiled a table on the types of materials, their quantities, and the respective prices that go into building a house. Both direct and indirect expenses are mentioned.
How Much Does it Cost to Build a 900 Square Feet House?
Square Feet | Average Cost |
900 | ₹10,80,000 – ₹16,20,000 |
An estimated ₹1200 to ₹1800 is spent per square foot area. Therefore, the construction cost would be around ₹10,80,000 to ₹16,20,000. One of the prerequisites for building a house is to understand the cost involved and then set a budget for it. This is only possible if you understand what materials and quantities of items are used when building a house.
Detailed Table for a 900 Square Feet House Construction
House Plans:
- 20 x 45 House Plan 2BHK
- 15 x 60 House Plan With Car Parking
- 18 x 50 House Plan 2bhk
- 30 x 30 House Plan 1bhk
Breaking Down the Expenses of Building a 900 Square Feet House
Work | Typical cost |
Materials | |
Cement | ₹1,20,000 – ₹1,50,000 |
Steel | ₹1,85,000 – ₹2,00,000 |
Sand | ₹50,000 – ₹65,000 |
Gravel | ₹55,000 – ₹70,000 |
Bricks | ₹40,000 – ₹55,000 |
Tiles | ₹25,000 – ₹50,000 |
Paint | ₹28,000 – ₹40,000 |
Windows | ₹15,000 – ₹30,000 |
Doors | ₹12,000 – ₹28,000 |
Plumbing | ₹10,000 – ₹18,000 |
Electrical | ₹28,000 – ₹52,000 |
Sanitary | ₹10,000 – ₹20,000 |
Labour | ₹3,40,000 – ₹4,20,000 |
Engineer Fees | 1 to 3% of the total cost of the project. |
Details on the estimated material to be used in the construction are as below:
Cement bags: the quantity of bags required could be somewhere around 388 bags each costing ₹360, therefore, taking the total to ₹1,39,680. Steel (in kgs) weighing 2250 with 1kg costing ₹85. This brings the total spent on steel to ₹1,91,250.
Sand (in Cubic ft.), unlike the other two previously mentioned items, costs a little less. For instance, sand weighing 1080 Cubic ft would be required, with the rate per Cubic ft being ₹55, and the total would be around ₹59,400. Gravel and bricks, too, would cost less than cement and bricks. Approximately 1216 Cubic ft of gravel and 6570 bricks would go into the House Construction Cost. Therefore, the total amounts are close to ₹60,800 for gravel and ₹45,900 for bricks.
These are part of the basic raw material one needs for constructing a House. Other items, which are just as important as those mentioned above, include – tiles for the floor, colour/paint, windows, doors and frames, etc. The details of these items have been given down below.
Tiles: 630 sq ft total. With 1sq ft costing somewhere around ₹50, the total amount would be ₹31,500. The colour or paint for walls (in liters) would be 108 liters with 1 liter Costing ₹300 thereby bringing the total to ₹32,400.
Next come the expenses on items such as plumbing fixtures, doors, electricals, windows and sanitary. An approximate lump sum on these would be somewhere around ₹1,20,000.
As for expenses for House Construction Costs of labour and engineer fee are₹3,60,900 and ₹18,000 respectively.
As mentioned, the total expenditure on construction would roughly amount to ₹10,59,920. Yet, expenses incurred on the floor above would be 25% less than what was spent on the ground floor. Hence, the budget for the building on the first floor would be around ₹6,00,000 to ₹8,00,000.
Conclusion
Consider these costs and quantities as approximates. The prices also vary because of the availability of materials and the cost of living in different places. Hence what a bag of cement costs in one city may be cheaper or costlier than what it costs in another city. As for the quantities used, you may want to expand or contract the building and design, therefore, the amount of raw material used also varies accordingly.
All in all, these estimates of House Construction Cost fall quite close to the real quantities and amount, hence, you could rely on these details for drawing up a budget.
You can also look at Construction Costs of different sizes, such as the:
-
How much would it cost to build a 900 square feet house in India?
An estimated ₹1200 to ₹1800 is spent per square foot area. Therefore, the construction cost of the house would be around ₹10,80,000 to ₹16,20,000.